Promote the Lockout tagout test
Through the audit, found the deficiencies in the implementation of the system order, and constantly improve. Lockout tagout test for many enterprises to promote the implementation of a certain degree of difficulty, mainly because we feel cumbersome, increase the workload, so continue to maintain ...Read more -
Effective extension of Lockout tagout test method
Effective extension of Lockout tagout test method Establish Lockout tagout test management system. In order to effectively implement the energy isolation management and ensure the safety of the working process, the Lockout tagout test management system should be developed first. It is suggested t...Read more -
Accidents caused by failure to implement LOTO
Accidents caused by failure to implement LOTO Q: Why do fire pipe valves hang normally open normally closed signs? Toll station where still need to hang usually open often closed sign? Answer: This is actually a standard requirement, that is, the fire valve to hang status identification, in order...Read more -
Lockout tagout program (LOTO) focuses on the following aspects
Lockout tagout program (LOTO) focuses on the following aspects: Sign production process: set up a working group; Evaluation machine; Prepare drafts of LOTO cards; Hold confirmation meetings; Issue, make and post signs; Conduct acceptance audit. Lockout/tagout Executor — To become an authori...Read more -
Workshop energy isolation implementation code
Workshop energy isolation implementation code 1. When energy isolation work is involved in the workshop, standard operation shall be carried out according to the Energy Isolation Management Regulations of a branch Company 2. Both locking and blind plates are energy isolation methods of the proce...Read more -
Electric Lockout tagout program in offshore oil and gas platform commissioning operation practice
Electric Lockout tagout program in offshore oil and gas platform commissioning operation practice The PL19-3 and PL25-6 offshore fields in the Bohai Sea are being jointly developed by Conocophillips China Limited and China National Offshore Oil Corporation. COPC is the operator responsible for th...Read more -
Electrical maintenance work
Electrical maintenance work 1 Operation Risk Electric shock hazards, electric arc hazards, or spark accidents caused by short circuit may occur during electrical maintenance, which may cause human injuries such as electric shock, burn caused by electric arc, and explosion and impact injury caused...Read more -
Does the written Lockout tagout procedure contain all the required information?
Does the written Lockout tagout procedure contain all the required information? Verify that the Lockout tagout program contains all of the following requirements: a) Identify all potential hazardous energy sources, b) isolation, c) Zero energy state, d) Any service or maintenance activities prior...Read more -
Set up authorized personnel ledger for management
Lockout tagout Training authorized personnel (New and re-training) Set up authorized personnel ledger for management On-site Lockout/tagout process audit (1) Evaluate and review the control points required for Lockout/tagout process on site. (2) Responsible for preparing the Lockout/tagout proces...Read more -
LOTOTO locks vs. administrative locks
LOTOTO locks vs. administrative locks Locks and signage used in LOTOTO must be clearly distinguished from all other management locks (e.g., state of the art locks, equipment supervisor locks, security locks, etc.). Don’t mix them. LOTOTO‘s special case When performing some test opera...Read more -
Does the written listing and locking procedure contain all the required information?
Does the written listing and locking procedure contain all the required information? Verify that the Lockout tagout program contains all of the following requirements: a) Identify all potential hazardous energy sources, b) isolation, c) Zero energy state, d) Any service or maintenance activities ...Read more -
Unauthorized access to the equipment
Unauthorized access to the equipment In May 2003, the operator of the adsorption area of a factory, Mr. Guo, was operating the inner liner forming equipment. Without telling anyone, he drilled into the normal operation of the equipment from the bile connecting station to the back of the adsorptio...Read more