Welcome to this website!

Company News

  • When to implement Lockout Tagout

    When to implement Lockout Tagout

    When to implement Lockout Tagout? Danger area: An area within three dimensions of the equipment (the equipment protection has been removed, or within the perimeter guardrail) where damage may result from the movement of equipment energy or parts or materials. No “Lockout tagout” opera...
    Read more
  • LOTO- Personnel responsibilities-Team leader and department manager

    LOTO- Personnel responsibilities-Team leader and department manager

    LOTO- Personnel responsibilities-Team leader and department manager Responsible for completing the detailed Lockout tagout procedure for each device requiring Lockout tagout. Develop and maintain a list of LOTO authorized personnel Issue locks to authorized personnel for Lockout tagout Ensure tha...
    Read more
  • LOTO- How to become an authorized person

    LOTO- How to become an authorized person

    LOTO- How to become an authorized person All authorized personnel must attend training and pass examinations. All authorized personnel must be verified on the spot by him or his supervisor (the supervisor is the qualified authorized person who has passed the examination) that the nine steps of LO...
    Read more
  • Follow Lockout tagout

    Follow Lockout tagout

    Follow Lockout tagout An employee of the factory next door went inside the equipment last night to work. The machine suddenly started and the employee was trapped inside. He was sent to the hospital and could not be rescued. Why does the machine suddenly start up? All machines need energy to ru...
    Read more
  • Energy isolation device specification

    Energy isolation device specification

    Energy isolation device specification Designated energy isolation points should be clearly marked: persistence Not affected by the weather standardized Format is consistent Label Content: Name and function of isolation device Type and magnitude of energy (e.g. hydraulic, compressed gas, etc.) Min...
    Read more
  • Transport equipment cleaning and site cleaning

    Transport equipment cleaning and site cleaning

    Transport equipment cleaning and site cleaning 1. Shall not use shovel or other tools to clean the crust on the conveying equipment when the conveying equipment is running; 2. Cleaning operation shall not be carried out when the roller of conveying equipment rotates; 3. The stones on the roller s...
    Read more
  • Belt conveyor Lockout tagout procedure

    Belt conveyor Lockout tagout procedure

    Belt conveyor Lockout tagout procedure February 6, 2009 night shift, Liuzhou Haoyang Labor Service Co., LTD. Worker LAN mou and Huang mou together in the raw material section sandstone crusher under the tail of the 03.04 belt machine, the material on the ground is cleaned into the 03.04 belt mach...
    Read more
  • Belt machine accident case

    Belt machine accident case

    Belt machine accident case 1, The afternoon of September 10, 2004, a cement factory packaging workshop, the staff of the pouring work, after the boot, the warehouse is not material, so holding steel pipe, standing on the screw conveyor beating the bottom of the warehouse. Warehouse material, read...
    Read more
  • Energy isolation cases in cement enterprises

    Energy isolation cases in cement enterprises

    Energy isolation cases in cement enterprises Cement enterprises are common belt conveyor, mill, roller press, mobile equipment, winch, screw conveyor, crusher, mixer, hand-held tools and other rotating, moving mechanical equipment. Mechanical injury refers to the injury caused by a powerful mech...
    Read more
  • Lockout Tagout Step – Seven steps

    Lockout Tagout Step – Seven steps

    Lockout Tagout Step – Seven steps “Don’t underestimate this Lockout tagout, in the construction site, some springs, flywheel, pressure fluid, gas, capacitor or heavy weight in the energy, sometimes harm to the operator, must pay attention to! This Lockout tagout can be simplifi...
    Read more
  • Does the figure 8 blind need Lockout tag when it is in pass-through state?

    Does the figure 8 blind need Lockout tag when it is in pass-through state?

    Does the figure 8 blind need Lockout tag when it is in pass-through state? For “Lockout tag“, it should be understood as an energy isolation Lockout tagout (LOTO). Once the blind plate is involved in the energy isolation purpose, it should comply with the Lockout tagout management re...
    Read more
  • Implement energy isolation Lockout tagout requirements

    Implement energy isolation Lockout tagout requirements

    Implement energy isolation Lockout tagout requirements Professional departments actively promote professional integration and joint management The Ministry of Safety and Environmental Protection as the work permit, fire operation, limited space operation, high operation, blind plate pumping and ...
    Read more