Comprehensive maintenance of the machine shop

Comprehensive maintenance of the machine shop

The safe and smooth operation of the power distribution room is the most important work in the autumn inspection for the comprehensive maintenance of the second class. This year autumn inspection, comprehensive maintenance of two classes for substation, power distribution room doors, Windows, cable trench, etc. intact; Low-voltage power distribution cabinet, instrument is clean without hidden dangers; Whether all kinds of instrument indicators are complete; Whether the power cable terminal joint is free from oxidation and overheating, whether the line is aging, and whether the grounding protection is non-destructive, etc., are checked in detail according to the item checklist, and are recorded and continuously tracked for rectification.

During the festival, comprehensive maintenance Team 2 does not relax the autumn inspection standard, earnestly implements the safety “Ten bans”, “Lockout Tagout” and other measures, carries out strict requirements on work tickets, on-site safety measures, personal protective equipment, etc., defines the responsible person and mutual insurance and unprofor partners, combing and identifying hazard sources in combination with CARC, and makes safety disclosure. Strive to autumn inspection work detailed and solid, detailed and complete, strive to find and solve problems, eliminate equipment hidden trouble, ensure the smooth operation of equipment.

Dingtalk_20211016092835


Post time: Oct-16-2021