Welcome to this website!
  • neye

China Supplier Lock Out Tag Out Cabinet - 10-Lock Padlock Station kit LG02 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have been also specializing in improving the things administration and QC system to ensure that we could preserve terrific gain within the fiercely-competitive company for Multi Hasp Lock , Lock Out Tag Out Kits , Lockout Station With Cover , If you are interested in any of our products, please feel free to contact us for more details. We hope to cooperate with more friends from all over the world.
China Supplier Lock Out Tag Out Cabinet - 10-Lock Padlock Station kit LG02 – Lockey Detail:

10-Lock Padlock Station  LG02

a) Made from engineering plastic PC.

b) It’s one piece design, with a cover to lock out.

c) Each hanger clip accommodates 2 padlocks or lockout hasps.

d) Lockable –Can use a combination padlock to limit access to authorized employee.

e) Overall size: 565mm(W)×400mm(H)×65mm(D).

 

Including:

Lockout Station (LS02)×1;

Safety Padlock (P38S-RED)×10;

Lockout Hasp (SH01)×1;

Lockout Hasp (SH02)×1;

Lockout Tag (LT03)×24;

Some cable tie.

 LG02_01 LG02_02

 width=

Considerations for Loto applications

Lockout Tagout safety procedures must be established, and operations and procedures for shutting down machinery and equipment and controlling potentially hazardous energy sources are required when performing repair or maintenance activities.

Employees must be trained in Lockout tagout prior to operation.

Outsourcing suppliers must also be aware of your company’s LOTO program.

The outsourcing supplier must perform Loto Lockout Tagout and let your employees know when they need to perform maintenance work on your equipment.

The Loto Lockout Tagout facility must be removed by the person who placed it.

When the Loto Lockout Tagout facility is used on different shifts, it is important to communicate and handover.

Regular inspection

Is the person trained to perform the “locking” properly qualified

Whether the locks and locking auxiliary devices and signs meet the safety requirements and are properly managed, and whether the locks are used for personal use

Are there alternative security measures for debugging and other exceptions

Whether the communication in the actual implementation is sufficient, whether the measures are carried out in strict accordance with the procedures, and whether there are corresponding working procedures.

 

The “Energy Isolation Information Board” shall be erected on site — the designated storage place for equipment locks, the centralized locking point for employees, the obtaining of relevant written program documents, the obtaining of standby hangtags, the visual isolation point chart, the information of authorized employees on duty and the information of the procedures used shall be publicized.

Contents above: 1. Name and phone number of centralized caller 2. Total number of locks in isolation group 3. Table 4 of isolation points Centralized Locking Box 5. Isolation System 6. Activity Plan 7. Dangerous Tag Removal Box 8.


Product detail pictures:

China Supplier Lock Out Tag Out Cabinet - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

China Supplier Lock Out Tag Out Cabinet - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

China Supplier Lock Out Tag Out Cabinet - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

China Supplier Lock Out Tag Out Cabinet - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

China Supplier Lock Out Tag Out Cabinet - 10-Lock Padlock Station kit LG02 – Lockey detail pictures


Related Product Guide:
Maintenance Safety –Lock Out & Tag Out(2)
Master the Lockout Tagout process

We thinks what clients think, the urgency of urgency to act from the interests of a purchaser position of principle, allowing for greater top quality, decrease processing costs, price ranges are much more reasonable, won the new and aged prospects the support and affirmation for China Supplier Lock Out Tag Out Cabinet - 10-Lock Padlock Station kit LG02 – Lockey , The product will supply to all over the world, such as: Argentina, Jordan, Mombasa, Our company insists on the principle of "Quality First, Sustainable Development", and takes "Honest Business, Mutual Benefits" as our developable goal. All members sincerely thank all old and new customers' support. We will keep working hard and offering you the highest-quality products and service.
  • This is a very professional wholesaler, we always come to their company for procurement, good quality and cheap.
    5 Stars By Debby from venezuela - 2018.09.21 11:44
    Product variety is complete, good quality and inexpensive, the delivery is fast and transport is security, very good, we are happy to cooperate with a reputable company!
    5 Stars By Jason from Argentina - 2017.10.27 12:12
    Write your message here and send it to us