Welcome to this website!
  • neye

OEM Manufacturer Tsafe Professional Lockout Kit - Plastic Safety Scaffolding Holder tag SLT01 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our company promises all users of the first-class products and the most satisfying post-sale service. We warmly welcome our regular and new customers to join us for Needle Valve Lockout Device , Lockout Cable Device , 3 Pole Breaker Lockout , Top quality, timely company and Aggressive cost, all win us a superior fame in xxx field despite the international intense competition.
OEM Manufacturer Tsafe Professional Lockout Kit - Plastic Safety Scaffolding Holder tag SLT01 – Lockey Detail:

Plastic Safety Scaffolding Holder tag SLT01

a) The plastic scaffold tag holder is made from ABS, tag is made of PVC.

b) Provides system, procedural and legal compliance for scaffolds on work sites.

c) Provides a clear inspection trail giving integrity and control of work carried out.

d) The tags are avaliable in three durable write-on materials, providing highly visual and eye-catching information.

e) Each with a scaffold tag holder and a tag.The tags can be customized.

Part No. Description
SLT01 Size:310mm×92mm,Diameter:60mm
SLT02 Size:213mm×56mm
SLT03 Size: 81mm×39mm

SLT01新详情页_02 SLT01新详情页_05 SLT01新详情页_06 width=

Lock labeling requirements
First of all, durability, locks and signage should be able to withstand the environment being used; Secondly, it should be firm. Lock and signage should be strong enough to ensure that they cannot be removed without borrowing external forces. Also identifiable, the tag should be attached to the lock, indicating the name of the owner and the work being done; Finally, there should be uniqueness, each lock should only be equipped with a key, the key shall not be copied and others shall not be the master of the lock without authorization.

During the equipment debugging, by original isolated single sign, unlock and removal is not isolated in the list “isolation lift” column signature, just behind marked “lift for debugging,” date at the same time, the power equipment of electric transmission and electric debugging personnel by the project team is responsible for, so that we can facilitate in the process of debugging equipment, need test equipment operation, prevent because of frequent start-stop devices, frequently used in a work permit different isolation sheet. The electrical isolator will sign in the column of “Isolation Release” of the original isolation sheet only when the equipment is ready to be put into operation after commissioning. Due to the fact that different work types end the debugging on the same equipment successively, the electrical isolation lock and label should be hung back to the original position when the equipment is not put into operation after the debugging.
Is the person trained to perform the “locking” properly qualified
Whether the locks and locking auxiliary devices and signs meet the safety requirements and are properly managed, and whether the locks are used for personal use
Are there alternative security measures for debugging and other exceptions
Whether the communication in the actual implementation is sufficient, whether the measures are carried out in strict accordance with the procedures, and whether there are corresponding working procedures
Signs are divided into two kinds: general signs and local signs
LOTO master tag: A table representing a specific procedure for a locking device, identifying and describing the power source, locking/release point and method, validation method, and associated risks for the Lockout tagout. Also includes equipment tags
The layout diagram shows the location of the energy isolation points and the corresponding risks.
LOTO Local Signage: The approved local signage is posted directly on the equipment in a standard format, adjacent to the entrance or secured area. It defines the approved methods of energy control and the possible simple tasks to be performed within the danger zone.


Product detail pictures:

OEM Manufacturer Tsafe Professional Lockout Kit - Plastic Safety Scaffolding Holder tag SLT01 – Lockey detail pictures

OEM Manufacturer Tsafe Professional Lockout Kit - Plastic Safety Scaffolding Holder tag SLT01 – Lockey detail pictures

OEM Manufacturer Tsafe Professional Lockout Kit - Plastic Safety Scaffolding Holder tag SLT01 – Lockey detail pictures

OEM Manufacturer Tsafe Professional Lockout Kit - Plastic Safety Scaffolding Holder tag SLT01 – Lockey detail pictures


Related Product Guide:
Note for Lock out Tag out
Lockout/Tagout FAQ 3

We always continually offer you the most conscientious purchaser services, and the widest variety of designs and styles with finest materials. These efforts include the availability of customized designs with speed and dispatch for OEM Manufacturer Tsafe Professional Lockout Kit - Plastic Safety Scaffolding Holder tag SLT01 – Lockey , The product will supply to all over the world, such as: New Orleans, Romania, Ghana, Each product is carefully made, it will make you satisfied. Our merchandise in the production process have got strictly monitored, because it is only to supply you the best quality, we'll feel confident. High production costs but low prices for our long-term cooperation. You can have a variety choices and the value of all types are same reliable. If you have any question, do not hesitate to ask us.
  • In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Flora from Nicaragua - 2017.04.28 15:45
    It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.
    5 Stars By Elvira from Nepal - 2017.02.28 14:19
    Write your message here and send it to us