Welcome to this website!
  • neye

Fast delivery Universal Lockout Tool - 10-Lock Padlock Station kit LG02 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our company promises all buyers of the first-class products and solutions as well as most satisfying post-sale support. We warmly welcome our regular and new shoppers to join us for Cable Lockout Tagout Devices , Mcb Loto Lock , Lock Out Locks , Safety as a result of innovation is our promise to each other.
Fast delivery Universal Lockout Tool - 10-Lock Padlock Station kit LG02 – Lockey Detail:

10-Lock Padlock Station  LG02

a) Made from engineering plastic PC.

b) It’s one piece design, with a cover to lock out.

c) Each hanger clip accommodates 2 padlocks or lockout hasps.

d) Lockable –Can use a combination padlock to limit access to authorized employee.

e) Overall size: 565mm(W)×400mm(H)×65mm(D).

 

Including:

Lockout Station (LS02)×1;

Safety Padlock (P38S-RED)×10;

Lockout Hasp (SH01)×1;

Lockout Hasp (SH02)×1;

Lockout Tag (LT03)×24;

Some cable tie.

 LG02_01 LG02_02

 width=

Considerations for Loto applications

Lockout Tagout safety procedures must be established, and operations and procedures for shutting down machinery and equipment and controlling potentially hazardous energy sources are required when performing repair or maintenance activities.

Employees must be trained in Lockout tagout prior to operation.

Outsourcing suppliers must also be aware of your company’s LOTO program.

The outsourcing supplier must perform Loto Lockout Tagout and let your employees know when they need to perform maintenance work on your equipment.

The Loto Lockout Tagout facility must be removed by the person who placed it.

When the Loto Lockout Tagout facility is used on different shifts, it is important to communicate and handover.

Regular inspection

Is the person trained to perform the “locking” properly qualified

Whether the locks and locking auxiliary devices and signs meet the safety requirements and are properly managed, and whether the locks are used for personal use

Are there alternative security measures for debugging and other exceptions

Whether the communication in the actual implementation is sufficient, whether the measures are carried out in strict accordance with the procedures, and whether there are corresponding working procedures.

 

The “Energy Isolation Information Board” shall be erected on site — the designated storage place for equipment locks, the centralized locking point for employees, the obtaining of relevant written program documents, the obtaining of standby hangtags, the visual isolation point chart, the information of authorized employees on duty and the information of the procedures used shall be publicized.

Contents above: 1. Name and phone number of centralized caller 2. Total number of locks in isolation group 3. Table 4 of isolation points Centralized Locking Box 5. Isolation System 6. Activity Plan 7. Dangerous Tag Removal Box 8.


Product detail pictures:

Fast delivery Universal Lockout Tool - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

Fast delivery Universal Lockout Tool - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

Fast delivery Universal Lockout Tool - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

Fast delivery Universal Lockout Tool - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

Fast delivery Universal Lockout Tool - 10-Lock Padlock Station kit LG02 – Lockey detail pictures


Related Product Guide:
LOTO-Prevent valve misoperation(2)
Responsibilities of LOTO specialists

So as to provide you with ease and enlarge our business, we even have inspectors in QC Crew and guarantee you our best company and solution for Fast delivery Universal Lockout Tool - 10-Lock Padlock Station kit LG02 – Lockey , The product will supply to all over the world, such as: Monaco, Poland, Sweden, Furthermore, all of our items are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. If you are interested in any of our goods, please don't hesitate to contact us. We will do our best to meet your needs.
  • The sales person is professional and responsible, warm and polite, we had a pleasant conversation and no language barriers on communication.
    5 Stars By Louis from Ecuador - 2017.11.29 11:09
    The supplier cooperation attitude is very good, encountered various problems, always willing to cooperate with us, to us as the real God.
    5 Stars By Jo from Estonia - 2018.12.22 12:52
    Write your message here and send it to us