Welcome to this website!
  • neye

Fast delivery Professional Lockout Kit - 10-Lock Padlock Station kit LG02 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Based on domestic market and expand overseas business" is our development strategy for Lockout Tagout Station Cabinet , Loto System Safety , Cable Lockout Adjustable , sincerity and strength ,always keep approved good quanlity ,welcome to our factoty for visit and instruction and business.
Fast delivery Professional Lockout Kit - 10-Lock Padlock Station kit LG02 – Lockey Detail:

10-Lock Padlock Station  LG02

a) Made from engineering plastic PC.

b) It’s one piece design, with a cover to lock out.

c) Each hanger clip accommodates 2 padlocks or lockout hasps.

d) Lockable –Can use a combination padlock to limit access to authorized employee.

e) Overall size: 558x393x65mm.

Including:

1. Lockout station (LS02) 1PC;

2. Safety Padlock (P38S-RED) 10PCS;

3. Lockout hasp (SH01) 1PC;

4. Lockout hasp (SH02) 1PC;

5. Lockout tag (LT03)24PCS;

6. Some ribbons.

LG02_01 LG02_02

 width=

Considerations for Loto applications

Lockout Tagout safety procedures must be established, and operations and procedures for shutting down machinery and equipment and controlling potentially hazardous energy sources are required when performing repair or maintenance activities.

Employees must be trained in Lockout tagout prior to operation.

Outsourcing suppliers must also be aware of your company’s LOTO program.

The outsourcing supplier must perform Loto Lockout Tagout and let your employees know when they need to perform maintenance work on your equipment.

The Loto Lockout Tagout facility must be removed by the person who placed it.

When the Loto Lockout Tagout facility is used on different shifts, it is important to communicate and handover.

Regular inspection

Is the person trained to perform the “locking” properly qualified

Whether the locks and locking auxiliary devices and signs meet the safety requirements and are properly managed, and whether the locks are used for personal use

Are there alternative security measures for debugging and other exceptions

Whether the communication in the actual implementation is sufficient, whether the measures are carried out in strict accordance with the procedures, and whether there are corresponding working procedures.

 

The “Energy Isolation Information Board” shall be erected on site — the designated storage place for equipment locks, the centralized locking point for employees, the obtaining of relevant written program documents, the obtaining of standby hangtags, the visual isolation point chart, the information of authorized employees on duty and the information of the procedures used shall be publicized.

Contents above: 1. Name and phone number of centralized caller 2. Total number of locks in isolation group 3. Table 4 of isolation points Centralized Locking Box 5. Isolation System 6. Activity Plan 7. Dangerous Tag Removal Box 8.


Product detail pictures:

Fast delivery Professional Lockout Kit - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

Fast delivery Professional Lockout Kit - 10-Lock Padlock Station kit LG02 – Lockey detail pictures


Related Product Guide:
Lockout Tagout work guide
The content of the Lockout/tagout policy

Our enterprise since its inception, usually regards product top quality as business life, repeatedly enhance manufacturing technology, make improvements to product excellent and continuously strengthen enterprise total high quality administration, in strict accordance with all the national standard ISO 9001:2000 for Fast delivery Professional Lockout Kit - 10-Lock Padlock Station kit LG02 – Lockey , The product will supply to all over the world, such as: Liverpool, Senegal, Frankfurt, Many goods fully conform to the most rigorous of international guidelines and with our first-rate delivery service you will have them delivered at any time and in any place. And because Kayo deals in the entire spectrum of protective equipment, our customers don't have to waste time shopping around.
  • The supplier cooperation attitude is very good, encountered various problems, always willing to cooperate with us, to us as the real God.
    5 Stars By Honorio from Armenia - 2018.06.18 17:25
    Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Karen from Lyon - 2017.03.28 16:34
    Write your message here and send it to us