Welcome to this website!
  • neye

Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

High quality Initial,and Buyer Supreme is our guideline to offer the ideal assistance to our shoppers.At present, we are striving our best to become amongst the ideal exporters inside our industry to satisfy shoppers more want for Loto Lock Box , Ball Valve Loto Devices , Osha Lockout Tagout , Together with our efforts, our products and solutions have won the trust of clients and been very salable each here and abroad.
Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey Detail:

Safety Portable Lockout Bag  LB02&LB03

a) Made from durable waterproof nylon fabric.

b) Can custom made the sign on the lockout bag surface.

c) With easy carrying hand straps and a shoulder strap.

Part No. Description
LB02 350mm(L)×230mm(H)×210mm(W)
LB03 390mm(L)×290mm(H)×210mm(W)

 width=  width=  width=

Project Details

Categories:

Lockout bag

Perform the isolation

Production and maintenance employees also need to follow cleaning procedures, PPE specifications, and lockup procedures when implementing energy isolation programs.

Transfer and drain the residual chemicals in the process system in strict accordance with the cleaning procedures; At the same time, according to the process characteristics of the process pipeline cooking, cleaning or purging, to ensure that the residual chemicals as far as possible out of the operating area of the pipeline.

After the process system is cleaned up, it is necessary to test the process system to ensure that the amount of residual chemicals is below the minimum explosive limit and toxicity, and confirm and verify the effectiveness of cleaning.

For the valves, rotating equipment and energy sources in the energy isolation plan, it is also necessary to Lockout the tagout after the field operation according to the energy isolation plan to ensure that it is not misoperated by other personnel and ensure the integrity of the energy isolation plan in the maintenance or project process.

The energy isolation red card must be hung on the valve or equipment at the energy isolation point to inform and warn others not to operate. The red card indicates operator and date, isolation point equipment status, type of power source, etc.

Similarly, the valve at the energy isolation point should be locked so that others can not operate the valve equipment. The key of the lock shall be placed in the energy isolation lock box. After the energy isolation is completed, the lock box shall be locked by the production personnel, and the production personnel shall keep the key.

After the on-site maintenance team representatives confirm the energy isolation plan and install the energy isolation blind plate, the energy isolation box shall be locked at the same time. At this point, the on-site energy isolation program is protected by both the production and maintenance teams.

The maintenance team must confirm and verify the energy isolation plan on site before starting work on site, such as confirming the state of related valves, no material discharge from the pouring valve, confirming the isolation of electric energy such as switching equipment and measuring voltage, etc., before officially starting work on site.

The maintenance representative can not remove the maintenance lock from the energy lock box until the field repair work is completed and handed over to the production unit. Only then can the production personnel remove the energy isolation points on the site one by one, record and confirm them on the energy isolation schedule one by one, and restore them to the state of process pipelines and equipment before maintenance.


Product detail pictures:

Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey detail pictures

Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey detail pictures

Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey detail pictures


Related Product Guide:
LOTO-Prevent valve misoperation(1)
General unlocking procedure

It can be our accountability to satisfy your preferences and competently provide you. Your satisfaction is our greatest reward. We are searching ahead towards your visit for joint growth for Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey , The product will supply to all over the world, such as: Johannesburg, Ireland, Serbia, We will not only continuously introduce technical guidance of experts from both home and abroad, but also develop the new and advanced products constantly to satisfactorily meet the needs of our clients all over the world.
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Eunice from Anguilla - 2018.09.23 17:37
    The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
    5 Stars By Teresa from Sheffield - 2017.10.27 12:12
    Write your message here and send it to us