Sticking to the principle of "Super High-quality, Satisfactory service" ,We are striving to generally be a very good business partner of you for Ball Valve Loto Devices , Valve Lock Out Tag Out , Group Lockout Station , Our business has already setup a professional, creative and responsible workforce to develop purchasers together with the multi-win principle.
Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey Detail:

Safety Portable Lockout Bag  LB02&LB03

a) Made from durable waterproof nylon fabric.

b) Can custom made the sign on the lockout bag surface.

c) With easy carrying hand straps and a shoulder strap.

Part No. Description
LB02 350mm(L)×230mm(H)×210mm(W)
LB03 390mm(L)×290mm(H)×210mm(W)

 width=  width=  width=

Project Details

Categories:

Lockout bag

Perform the isolation

Production and maintenance employees also need to follow cleaning procedures, PPE specifications, and lockup procedures when implementing energy isolation programs.

Transfer and drain the residual chemicals in the process system in strict accordance with the cleaning procedures; At the same time, according to the process characteristics of the process pipeline cooking, cleaning or purging, to ensure that the residual chemicals as far as possible out of the operating area of the pipeline.

After the process system is cleaned up, it is necessary to test the process system to ensure that the amount of residual chemicals is below the minimum explosive limit and toxicity, and confirm and verify the effectiveness of cleaning.

For the valves, rotating equipment and energy sources in the energy isolation plan, it is also necessary to Lockout the tagout after the field operation according to the energy isolation plan to ensure that it is not misoperated by other personnel and ensure the integrity of the energy isolation plan in the maintenance or project process.

The energy isolation red card must be hung on the valve or equipment at the energy isolation point to inform and warn others not to operate. The red card indicates operator and date, isolation point equipment status, type of power source, etc.

Similarly, the valve at the energy isolation point should be locked so that others can not operate the valve equipment. The key of the lock shall be placed in the energy isolation lock box. After the energy isolation is completed, the lock box shall be locked by the production personnel, and the production personnel shall keep the key.

After the on-site maintenance team representatives confirm the energy isolation plan and install the energy isolation blind plate, the energy isolation box shall be locked at the same time. At this point, the on-site energy isolation program is protected by both the production and maintenance teams.

The maintenance team must confirm and verify the energy isolation plan on site before starting work on site, such as confirming the state of related valves, no material discharge from the pouring valve, confirming the isolation of electric energy such as switching equipment and measuring voltage, etc., before officially starting work on site.

The maintenance representative can not remove the maintenance lock from the energy lock box until the field repair work is completed and handed over to the production unit. Only then can the production personnel remove the energy isolation points on the site one by one, record and confirm them on the energy isolation schedule one by one, and restore them to the state of process pipelines and equipment before maintenance.


Product detail pictures:

Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey detail pictures

Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey detail pictures

Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey detail pictures


Related Product Guide:
Incorporate the transfer lockout system into your lockout plan
The necessity of Lockout tagout LOTO

Each individual member from our large performance revenue crew values customers' needs and company communication for Factory wholesale Lockout Tagout Lock Box - Waterproof Lockout Tagout Tool Bag LB02 LB03 – Lockey , The product will supply to all over the world, such as: Kazakhstan, Turkmenistan, Benin, Our items have national accreditation requirements for qualified, high quality products, affordable value, was welcomed by people today all over the world. Our goods will continue to enhance within the order and look forward to cooperation with you, Should any of these products be of interest to you, please letus know. We are going to be content to offer you a quotation up on receipt of your detailed needs.
  • We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
    5 Stars By Roland Jacka from Egypt - 2017.05.02 18:28
    This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
    5 Stars By Freda from Pakistan - 2017.03.28 16:34
    Write your message here and send it to us