Assume full duty to satisfy all demands of our clients; reach steady advancements by marketing the development of our purchasers; grow to be the final permanent cooperative partner of clientele and maximize the interests of customers for Universal Lockout Tool Kit , Lockout Tagout Board , Lockout Tags , We are hunting ahead to building positive and beneficial links with the businesses round the globe. We warmly welcome you to definitely call us to begin discussions on how we can easily bring this into being.
Chinese wholesale Lockout Management Station - Electrical PC Lock out Loto Station LS11-16 – Lockey Detail:

Combined Lockout Station LS11-16

a) Made from engineering plastic PC.

b)  It’s one piece design, with a cover to lock out.

c)  Can accommodate several padlock, hasp, tagout and mini lockout etc.

d) There’s a lockable combination padlock hole for locking out to limit access to authorized employees.

e) The overall size: 520mm(W)x631mm(H)x85mm(D).

Part No. Description
LS11 Can accommodate 60 padlocks.
LS12 Can accommodate 40 padlocks, 8 hasps and tags.
LS13 Can accommodate 40 padlocks and mini lockouts.
LS14 Can accommodate a number of lockout tags.
LS15 Can accommodate a number of tags and mini lockouts.
LS16 Can accommodate 20 padlocks and 2 writing boards.

LS11-LS16_01 LS11-LS16_02 width=

Project Details

Categories:

Lockout Station

Lockout tagout procedures
1) Preparation
Hold a report meeting before the start of work, define the form, scale, risk, device and corresponding inspection steps of the energy control, register the equipment to be locked, and fill in the Lockout Tagout work sheet. The authorized person notifies all affected persons in the lock-controlled area.
2) stop
Authorize personnel to shut down and test machinery and equipment and conduct planned shutdowns to avoid additional risks.
3) the isolation
Close switches, valves and other isolation devices, to isolate dangerous energy, to avoid dangerous energy connected to the machine, equipment, if the conditions permit, but also as far as possible to set the closed physical railings.
4) Energy release
The stored and remaining energy must be safely released or eliminated, uninterrupted inspection until the completion of the operation, so that there is no possibility of energy accumulation, to achieve zero energy state.
5) Lockout tagout
Authorize personnel to implement Lockout Tagout for the equipment that has completed isolation
In the locked-control state, no one is allowed to attempt to operate switches, valves or other energy isolation devices. Removing the tag of someone else’s padlock is equivalent to removing the padlock and prohibits similar behavior. Uniform standard identification plates should be used, containing the following information: Unauthorized use of locked equipment or machines is prohibited; The removal of signage plates is prohibited; Sign board owner, date and reason for listing. The signboard should be firmly hung to ensure that it will not fall off easily or be accidentally knocked off by staff.
6) test
After confirming that all people are far away from the designated machine and equipment, a normal operation test shall be conducted by an authorized person to confirm that the power supply of the machine and equipment required to be locked has been cut off and cannot work.
7) work
Carry out installation, maintenance, cleaning and other construction operations.
8) Unlock the cards
Before unlocking the lock, the person shall check the equipment and area in his/her charge, confirm that the related work of the machine and equipment has been completed, and then remove the lock and tag of himself/herself and register in the work sheet. When there is a special situation that can’t get in touch with the relief personnel, the supervisor should complete the inspection on their behalf. After repeatedly confirming that there is no problem, the debugging manager can order to cut off or destroy the lock and mark, and report to the site manager after thoroughly investigating the cause of the incident.


Product detail pictures:

Chinese wholesale Lockout Management Station - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures

Chinese wholesale Lockout Management Station - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures

Chinese wholesale Lockout Management Station - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures

Chinese wholesale Lockout Management Station - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures

Chinese wholesale Lockout Management Station - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures


Related Product Guide:
Lockout Tagout Training Authorized Personnel
Compliance by all relevant personnel

With reliable excellent approach, great name and ideal consumer services, the series of products and solutions produced by our company are exported to many countries and regions for Chinese wholesale Lockout Management Station - Electrical PC Lock out Loto Station LS11-16 – Lockey , The product will supply to all over the world, such as: Washington, Cannes, Pakistan, By integrating manufacturing with foreign trade sectors, we can provide total customer solutions by guaranteeing the delivery of right products to the right place at the right time, which is supported by our abundant experiences, powerful production capability, consistent quality, diversified product portfolios and the control of the industry trend as well as our mature before and after sales services. We'd like to share our ideas with you and welcome your comments and questions.
  • The manufacturer gave us a big discount under the premise of ensuring the quality of products, thank you very much, we will select this company again.
    5 Stars By Hulda from UAE - 2017.08.15 12:36
    This company has a lot of ready-made options to choose and also could custom new program according to our demand, which is very nice to meet our needs.
    5 Stars By Sophia from Bandung - 2017.11.12 12:31
    Write your message here and send it to us