2020 wholesale price Lockout Station Board - Electrical PC Lock out Loto Station LS11-16 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our pursuit and corporation aim should be to "Always satisfy our consumer requirements". We carry on to build and style and design remarkable quality items for both our outdated and new clients and reach a win-win prospect for our clients at the same time as us for Padlock Station , Emergency Stop Button Lockout , Ball Valve Lock Open , We sincerely welcome friends to negotiate business and start cooperation. We hope to join hands with friends in different industries to create a brilliant future.
2020 wholesale price Lockout Station Board - Electrical PC Lock out Loto Station LS11-16 – Lockey Detail:

Combined Lockout Station LS11-16

a) Made from engineering plastic PC.

b)  It’s one piece design, with a cover to lock out.

c)  Can accommodate several padlock, hasp, tagout and mini lockout etc.

d) There’s a lockable combination padlock hole for locking out to limit access to authorized employees.

e) The overall size: 520mm(W)x631mm(H)x85mm(D).

Part No. Description
LS11 Can accommodate 60 padlocks.
LS12 Can accommodate 40 padlocks, 8 hasps and tags.
LS13 Can accommodate 40 padlocks and mini lockouts.
LS14 Can accommodate a number of lockout tags.
LS15 Can accommodate a number of tags and mini lockouts.
LS16 Can accommodate 20 padlocks and 2 writing boards.

LS11-LS16_01 LS11-LS16_02 width=

Project Details

Categories:

Lockout Station

Lockout tagout procedures
1) Preparation
Hold a report meeting before the start of work, define the form, scale, risk, device and corresponding inspection steps of the energy control, register the equipment to be locked, and fill in the Lockout Tagout work sheet. The authorized person notifies all affected persons in the lock-controlled area.
2) stop
Authorize personnel to shut down and test machinery and equipment and conduct planned shutdowns to avoid additional risks.
3) the isolation
Close switches, valves and other isolation devices, to isolate dangerous energy, to avoid dangerous energy connected to the machine, equipment, if the conditions permit, but also as far as possible to set the closed physical railings.
4) Energy release
The stored and remaining energy must be safely released or eliminated, uninterrupted inspection until the completion of the operation, so that there is no possibility of energy accumulation, to achieve zero energy state.
5) Lockout tagout
Authorize personnel to implement Lockout Tagout for the equipment that has completed isolation
In the locked-control state, no one is allowed to attempt to operate switches, valves or other energy isolation devices. Removing the tag of someone else’s padlock is equivalent to removing the padlock and prohibits similar behavior. Uniform standard identification plates should be used, containing the following information: Unauthorized use of locked equipment or machines is prohibited; The removal of signage plates is prohibited; Sign board owner, date and reason for listing. The signboard should be firmly hung to ensure that it will not fall off easily or be accidentally knocked off by staff.
6) test
After confirming that all people are far away from the designated machine and equipment, a normal operation test shall be conducted by an authorized person to confirm that the power supply of the machine and equipment required to be locked has been cut off and cannot work.
7) work
Carry out installation, maintenance, cleaning and other construction operations.
8) Unlock the cards
Before unlocking the lock, the person shall check the equipment and area in his/her charge, confirm that the related work of the machine and equipment has been completed, and then remove the lock and tag of himself/herself and register in the work sheet. When there is a special situation that can’t get in touch with the relief personnel, the supervisor should complete the inspection on their behalf. After repeatedly confirming that there is no problem, the debugging manager can order to cut off or destroy the lock and mark, and report to the site manager after thoroughly investigating the cause of the incident.


Product detail pictures:

2020 wholesale price Lockout Station Board - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures

2020 wholesale price Lockout Station Board - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures

2020 wholesale price Lockout Station Board - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures

2020 wholesale price Lockout Station Board - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures

2020 wholesale price Lockout Station Board - Electrical PC Lock out Loto Station LS11-16 – Lockey detail pictures


Related Product Guide:
Lockout Tagout Training Authorized Personnel
Note for Lock out Tag out

High-quality comes 1st; assistance is foremost; business enterprise is cooperation" is our business enterprise philosophy which is constantly observed and pursued by our business for 2020 wholesale price Lockout Station Board - Electrical PC Lock out Loto Station LS11-16 – Lockey , The product will supply to all over the world, such as: Honduras, Swiss, Madras, Our company follows laws and international practice. We promise to be responsible for friends, customers and all partners. We would like to establish a long-term relationship and friendship with every customer from all over the world on the basis of mutual benefits. We warmly welcome all old and new customers to visit our company to negotiate business.
  • The quality of the products is very good, especially in the details, can be seen that the company work actively to satisfy customer's interest, a nice supplier.
    5 Stars By John from Brasilia - 2018.05.13 17:00
    The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Erica from Melbourne - 2018.06.05 13:10
    Write your message here and send it to us