Welcome to this website!
  • neye

2020 wholesale price Breaker Lockout Kit - Lockout Tagout Kit LG03 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have state-of-the-art tools. Our products are exported towards the USA, the UK and so on, enjoying a fantastic reputation amongst customers for Mccb Lockout Devices , Lock Out Tag Out Padlocks , Lockout Tagout Breaker Locks , "Change for that improved!" is our slogan, which means "A better globe is before us, so let's take pleasure in it!" Change for the better! Are you all set?
2020 wholesale price Breaker Lockout Kit - Lockout Tagout Kit LG03 – Lockey Detail:

Lockout Tagout Kit  LG03

a) It is an industrial selection of lockout/tagout devices.

b) For locking off all kinds of circuit breakers, valves, switches, etc.

c) All items can be easily carried in lightweight carrying tool box.

d) Tool Box Overall size: 410x190x185mm.

Including:

1. Lockout kit box (PLK11) 1PC;

2. Lockout hasp (SH01) 2PCS;

3. Lockout hasp (SH02) 2PCS;

4. Safety padlock (P38S-RED) 4PCS;

5. Lockout hasp (NH01) 2PCS;

6. Cable lockout (CB01-6) 1PC;

7. Valve lockout (AGVL01) 1PC;

8. Valve lockout (ABVL01) 1PC;

9. Breaker lockout (CBL11) 2PCS;

10. Breaker lockout (CBL12) 1PC;

11. Breaker lockout (TBLO) 1PC;

12. Lockout tag (LT03) 12PCS.

 

LG03_01 LG03_02 LG03_03 width=Application of the LOTO scheme
This standard applies to, but is not limited to, activities performed on a machine, equipment, process or circuit.
Primary, secondary, stored or separate power sources are locked for service and maintenance purposes. Definition of services and maintenance: repair, preventive maintenance, improvement and installation activities for machines, equipment, processes and wiring. These activities require a machine, equipment, process or circuit, or its components, to be in a “zero energy state”. The person performing these activities must use the Lockout Tagout in accordance with the procedures. An alternative method should be used when the Lockout tagout for machine, equipment, and process routes cannot be used.
All storage energy must be controlled to ensure that the machine is completely safe.
The following is a list of typical activities to which energy control procedures apply:
Build – install – build – repair – adjust
Verify – open – assemble – find and resolve faults – test
Clean – Remove – Maintain – Repair – Lubricate
An alternative can be used if:
The Loto scheme is not feasible
This work behavior is routine, repetitive, and integrated with the production process.
Minor modifications and adjustments to tools, assembly, opening, parts;
No LOTO alternatives are scheduled for the task;
Mission specific training is not provided.
A device with a wired plug for a separate power source may not Lockout a tagout when the plug is disconnected and the authorized person has exclusive control over the disconnection of the power source.

Alternative methods
Finishing Lockout Tagout is always the first choice.
Alternative approaches must be established based on risk assessments of machines, equipment, processes, and circuits.
Such alternative risk assessment and procedures must also include the identification of procedures that need to be implemented prior to the commencement of work, in accordance with other requirements or country-specific regulations, to reduce or eliminate the employee’s exposure to risk
The risk assessment
Risk assessment is used to identify the safest possible conditions for individual operations. The risk assessment establishes safety measures and alternatives that can be used to reduce the likelihood of injury if normal Lockout Tagout procedures cannot be applied. The risk assessment must include the identification and implementation of control measures so that other regulatory requirements can be met.
Shift or personnel changes
The maximum allowable time for each Lockout tagout is the shorter of one shift or the end of the task. It is important to ensure the integrity of the Lockout Tagout procedure either individually or through the use of direct Lockout Tagout handoff, transform lock, or other appropriate means.
The LOTO of contract behavior
It is important that all aspects of the company’s Lockout tagout be adhered to whether the contractor is on a site/running the construction or the company’s personnel are performing the work as the contractor. One of the best practices is to designate a representative authorized by the Company to perform the Lockout Tagout procedure, in which case the external service personnel or contractor should attach their own Lockout Tagout to the same energy isolation device that the Company Representative has locked and hold in place. This is commonly referred to as “the company first up, then down”.


Product detail pictures:

2020 wholesale price Breaker Lockout Kit - Lockout Tagout Kit LG03 – Lockey detail pictures


Related Product Guide:
Lock out tag out help guidelines
Compliance by all relevant personnel

"Quality to start with, Honesty as base, Sincere company and mutual profit" is our idea, as a way to build constantly and pursue the excellence for 2020 wholesale price Breaker Lockout Kit - Lockout Tagout Kit LG03 – Lockey , The product will supply to all over the world, such as: Sri Lanka, kazan, Greece, We always insist on the management tenet of "Quality is First, Technology is Basis, Honesty and Innovation".We are able to develop new products continuously to a higher level to satisfy different needs of customers.
  • Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By Christopher Mabey from Jersey - 2017.11.12 12:31
    Problems can be quickly and effectively resolved, it is worth to be trust and working together.
    5 Stars By Elaine from Cyprus - 2017.05.02 11:33
    Write your message here and send it to us