Welcome to this website!
  • neye

2020 Latest Design Lockout For Breaker - 10-Lock Padlock Station kit LG02 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Fast and very good quotations, informed advisers to help you choose the correct merchandise that suits all your preferences, a short creation time, responsible excellent command and different companies for paying and shipping affairs for Lock Out Tag Out , Loto Tag Out , Lock Out Tag Out Safety , In addition, we would properly guide the customers about the application techniques to adopt our products and the way to select appropriate materials.
2020 Latest Design Lockout For Breaker - 10-Lock Padlock Station kit LG02 – Lockey Detail:

10-Lock Padlock Station  LG02

a) Made from engineering plastic PC.

b) It’s one piece design, with a cover to lock out.

c) Each hanger clip accommodates 2 padlocks or lockout hasps.

d) Lockable –Can use a combination padlock to limit access to authorized employee.

e) Overall size: 565mm(W)×400mm(H)×65mm(D).

 

Including:

Lockout Station (LS02)×1;

Safety Padlock (P38S-RED)×10;

Lockout Hasp (SH01)×1;

Lockout Hasp (SH02)×1;

Lockout Tag (LT03)×24;

Some cable tie.

 LG02_01 LG02_02

 width=

Considerations for Loto applications

Lockout Tagout safety procedures must be established, and operations and procedures for shutting down machinery and equipment and controlling potentially hazardous energy sources are required when performing repair or maintenance activities.

Employees must be trained in Lockout tagout prior to operation.

Outsourcing suppliers must also be aware of your company’s LOTO program.

The outsourcing supplier must perform Loto Lockout Tagout and let your employees know when they need to perform maintenance work on your equipment.

The Loto Lockout Tagout facility must be removed by the person who placed it.

When the Loto Lockout Tagout facility is used on different shifts, it is important to communicate and handover.

Regular inspection

Is the person trained to perform the “locking” properly qualified

Whether the locks and locking auxiliary devices and signs meet the safety requirements and are properly managed, and whether the locks are used for personal use

Are there alternative security measures for debugging and other exceptions

Whether the communication in the actual implementation is sufficient, whether the measures are carried out in strict accordance with the procedures, and whether there are corresponding working procedures.

 

The “Energy Isolation Information Board” shall be erected on site — the designated storage place for equipment locks, the centralized locking point for employees, the obtaining of relevant written program documents, the obtaining of standby hangtags, the visual isolation point chart, the information of authorized employees on duty and the information of the procedures used shall be publicized.

Contents above: 1. Name and phone number of centralized caller 2. Total number of locks in isolation group 3. Table 4 of isolation points Centralized Locking Box 5. Isolation System 6. Activity Plan 7. Dangerous Tag Removal Box 8.


Product detail pictures:

2020 Latest Design Lockout For Breaker - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

2020 Latest Design Lockout For Breaker - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

2020 Latest Design Lockout For Breaker - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

2020 Latest Design Lockout For Breaker - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

2020 Latest Design Lockout For Breaker - 10-Lock Padlock Station kit LG02 – Lockey detail pictures


Related Product Guide:
Compliance by all relevant personnel
Verify the Lockout Tagout program requirements

The really abundant projects management experiences and 1 to just one provider model make the high importance of business enterprise communication and our easy understanding of your expectations for 2020 Latest Design Lockout For Breaker - 10-Lock Padlock Station kit LG02 – Lockey , The product will supply to all over the world, such as: Georgia, Melbourne, Bangladesh, If you are interested in any of our products and solutions or would like to discuss a custom order, remember to feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.
  • The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.
    5 Stars By Jane from Germany - 2018.10.01 14:14
    We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
    5 Stars By Nainesh Mehta from Burundi - 2018.12.28 15:18
    Write your message here and send it to us